7-Day Bathroom Remodel in El Cajon

We gave this dated bathroom new large-format tile floors, a new vanity, new lighting and fresh paint, and finished on the 7-day schedule we planned from the start.

Remodeled bathroom with new vanity and large-format marble-look tile floor in El Cajon, CA
ProjectBathroom remodel
LocationEl Cajon, CA
Completed2024
Timeline7 working days

What We Did

  • Removed the old corner tub, two vanities, laminate flooring and baseboards.
  • Installed new cement board and leveled the floor, then laid 12x24 porcelain tile with tight 1/8-inch grout lines, sealed.
  • Installed the new vanity, shortening its depth to fit the room, and moved the electrical to suit.
  • Hung new vanity lights centered on the faucets, and new mirrors.
  • Installed and painted new baseboards, primed and painted the walls and ceiling, and finished with caulking and touch-ups.

Before & After

Bathroom before, with corner soaking tub and vinyl floor
Before
Bathroom after, with new vanity and 12x24 porcelain tile floor
After

What the homeowner said

“The projected time frame was 7 days, which they accomplished. Everyday the crew was here on time accomplished whatever was on the agenda for the day, always putting materials and tools away ready for the next day.”

Nancy D. · Google review